After powering on the S4048-ON switch, it goes through a power-on self-test (POST).
Example of the grub bootloader
POST runs every time that the switch is initialized and checks hardware components to determine if the switch is fully operational before booting. After POST, the switch uses the Grub bootloader.
Use the up and down arrow keys to select which entry is highlighted. Press Enter to select an OS or enter
e to edit the commands before booting. Enter
c for a command line. The highlighted entry runs automatically in the operating system.
ONIE: Install OS
For downloading and installing an OS from a URL
Starts ONIE with ONIE Discovery Service
(factory default boot)
ONIE: Rescue
Starts ONIE without ONIE Discovery Service
Useful for running Diagnostics manually
ONIE: Uninstall OS
Restore to factory defaults erases any installed OS
ONIE: Update ONIE
For downloading and updating ONIE from a URL
ONIE: Embed ONIE
For downloading and updating ONIE from a URL and erases any installed OS
ONIE: Diag ONIE
Run Diagnostic package for S4048-ON
Dell EMC DIAG
Run Dell EMC Networking Diagnostic package for <platform>
During initial setup, the switch boots to ONIE Install. ONIE Install boots with ONIE Discovery to the console (ONIE:).
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\